Successful installation of C2 Tower of Olefin plant, marking another key milestone of LSP’s project progress

Long Son, Ba Ria Vung Tau, 12 November 2021 – LSP led by Mr. Tharna Sanee, General Director and Mr. Pholavit Thiebpattama, Deputy General Director together with TPSK led by Mr. Vincenzo Lagana, Project Director and Mr. Jens Kim, Site Manager joined the C2 tower installation event. Strictly complied with safety procedures, the lifting and installation of more than 478 metric tons of C2 tower has been done safely.

The C2 tower is one of large equipment of olefin plant, used for purifying ethylene before sending to polyolefins plants to produce plastic resins.